{"id":1395,"date":"2026-01-03T09:00:00","date_gmt":"2026-01-03T01:00:00","guid":{"rendered":"https:\/\/eqsvq3fzct.wpdns.site\/blog\/what-is-the-difference-between-rcbo-and-rccb-2\/"},"modified":"2026-10-24T14:18:41","modified_gmt":"2026-10-24T06:18:41","slug":"what-is-the-difference-between-rcbo-and-rccb-2","status":"publish","type":"post","link":"https:\/\/w9-group.com\/ja\/blog\/what-is-the-difference-between-rcbo-and-rccb-2\/","title":{"rendered":"RCBO\u3068RCCB\u306e\u9055\u3044\u306f\u4f55\u3067\u3059\u304b\uff1f"},"content":{"rendered":"<p>For panel buyers, comparing RCBO and RCCB schedules is not simply a choice between two device names. An incomplete specification can overlook the separate overcurrent device, neutral arrangement or residual-current type. Compare the complete protective arrangement before releasing the bill of materials.<\/p>\n<p>Summary: An RCBO combines residual-current and overcurrent protection in one device; an RCCB provides residual-current protection and needs separate overcurrent protection. The correct choice depends on circuit arrangement, rated current, <strong>\u6b8b\u7559\u96fb\u6d41\u578b<\/strong> and fault duty under the applicable installation rules. Record the exact model, poles, sensitivity, coordination and test evidence before ordering, then verify the complete assembly at commissioning.<\/p>\n<h2>RCBO and RCCB Protection Scope<\/h2>\n<p>The difference is functional: RCBOs coordinate two protection functions in one housing, while RCCBs monitor residual current without integral overload protection. The comparison should be made at the circuit and assembly level, not from abbreviations alone.<\/p>\n<p>The <a href=\"https:\/\/w9-group.com\/ja\/blog\/rcd-%e9%96%a2%e6%95%b0%e3%81%a8%e3%81%af%e4%bd%95%e3%81%a7%e3%81%99%e3%81%8b%ef%bc%9f\/\">RCD function guide<\/a> provides background on residual-current protection.<\/p>\n<h2>RCBO vs RCCB Circuit Arrangements<\/h2>\n<p>With an RCBO, each final circuit can have dedicated overcurrent and <strong>\u6b8b\u7559\u96fb\u6d41\u4fdd\u8b77<\/strong>. With an RCCB, a separate MCB or fuse must be selected and coordinated. Both still require correct neutral routing, residual-current type and test procedures.<\/p>\n<p>Can an RCCB replace an MCB? No: an RCCB has no integral overcurrent protection, so it cannot replace the overload and short-circuit function of an MCB. An RCBO combines residual-current and overcurrent protection, as explained in Schneider Electric&#8217;s RCBO and RCCB comparison. For an RCCB-based design, identify the separate overcurrent device on the circuit schedule and verify the manufacturer&#8217;s coordination requirements rather than assuming the RCCB&#8217;s rated current provides overload protection. A substitution therefore requires review of the complete configuration, not just matching the current rating printed on the front.<\/p>\n<p>For related residual-current considerations, see the <a href=\"https:\/\/w9-group.com\/ja\/blog\/%e9%9b%bb%e6%b0%97%e5%ae%89%e5%85%a8%e3%81%ab%e3%81%8a%e3%81%91%e3%82%8brccb%e3%81%ae%e9%87%8d%e8%a6%81%e6%80%a7%e3%82%92%e7%90%86%e8%a7%a3%e3%81%99%e3%82%8b\/\">RCCB safety article<\/a>.<\/p>\n<h3>Panel Space and Maintenance Requirements<\/h3>\n<p>An RCBO can simplify circuit-level discrimination but may change the bill of materials and spare strategy. An RCCB can protect several downstream circuits as a group, but a downstream fault may disconnect more loads. Confirm pole count, busbar compatibility, settings and local rules before finalizing the panel.<\/p>\n<p>Is an RCBO always the best choice? No. Its combined protection functions, documented in Schneider Electric&#8217;s comparison, establish what it does, not a universal ranking. Compare an RCBO-per-circuit schedule with the proposed RCCB-plus-overcurrent arrangement as complete configurations. Request actual device dimensions and enclosure layouts; do not assume either option is always smaller or cheaper. Review which loads would be disconnected by a fault, how the maintenance team would identify the affected circuit, and which replacement devices must be stocked. Those procurement checks help establish the practical trade-off without treating combined protection as a guarantee against every electric-shock hazard.<\/p>\n<h2>RCBO vs RCCB Comparison<\/h2>\n<table>\n<thead>\n<tr>\n<th>\u5bf8\u6cd5<\/th>\n<th>RCBO<\/th>\n<th>RCCB<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>\u904e\u96fb\u6d41\u4fdd\u8b77<\/td>\n<td>Integral<\/td>\n<td>Separate device required<\/td>\n<\/tr>\n<tr>\n<td>Fault isolation<\/td>\n<td>Typically circuit-level<\/td>\n<td>May disconnect a group<\/td>\n<\/tr>\n<tr>\n<td>Coordination work<\/td>\n<td>Device and downstream load<\/td>\n<td>RCCB plus MCB\/fuse chain<\/td>\n<\/tr>\n<tr>\n<td>\u8abf\u9054<\/td>\n<td>Check exact combined model<\/td>\n<td>Check matched protective pair<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Comparing the complete protective arrangement<\/h2>\n<p>Compare an RCBO-per-circuit design with an RCCB plus its coordinated MCBs as complete systems. Include the width of the selected models, neutral-bar separation, spare ways and the upstream backup device; neither abbreviation establishes the panel space or cost. An RCCB&#8217;s <strong>\u5b9a\u683c\u96fb\u6d41<\/strong> is a carrying rating, not an overload pickup setting.<\/p>\n<p>For continuity, identify which healthy circuits lose supply when one circuit develops leakage. Separate RCBOs can reduce the extent of that disconnection, but selectivity with upstream protection still needs review. For a shared RCCB, measure aggregate standing leakage and consider the operational consequence of one group trip rather than treating every nuisance trip as a defective device.<\/p>\n<h2>RCBO and RCCB Application Selection<\/h2>\n<table>\n<thead>\n<tr>\n<th>\u30d7\u30ed\u30b8\u30a7\u30af\u30c8\u306e\u72b6\u6cc1<\/th>\n<th>Preferred verification path<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Many independent final circuits<\/td>\n<td>Compare RCBO circuit-by-circuit isolation and space<\/td>\n<\/tr>\n<tr>\n<td>Grouped distribution<\/td>\n<td>Check RCCB sensitivity and downstream selectivity<\/td>\n<\/tr>\n<tr>\n<td>Electronic or variable-speed loads<\/td>\n<td>Confirm residual-current waveform and Type A\/B need<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>\u57fa\u6e96\u3068\u30b3\u30f3\u30d7\u30e9\u30a4\u30a2\u30f3\u30b9<\/h2>\n<p>IEC 61009-1 covers RCBOs and IEC 61008-1 covers RCCBs. IEC 60364-4-41 sets installation-level shock-protection principles. These standards define scope and tests; they do not remove the need to verify the destination market, assembly standard, <strong>\u5c06\u6765\u7684\u306a\u6545\u969c\u96fb\u6d41<\/strong> and the exact model documentation.<\/p>\n<h2>\u9078\u5b9a\u304a\u3088\u3073\u8a66\u904b\u8ee2\u30c1\u30a7\u30c3\u30af\u30ea\u30b9\u30c8<\/h2>\n<ol>\n<li>\u8a18\u9332\u96fb\u5727\u3001\u96fb\u6d41\u3001\u30dd\u30fc\u30eb\u6570\u3001\u8ca0\u8377\u30d7\u30ed\u30d5\u30a1\u30a4\u30eb\u3001\u304a\u3088\u3073\u5c06\u6765\u7684\u306a\u6545\u969c\u96fb\u6d41\u3002.<\/li>\n<li>\u627f\u8a8d\u3055\u308c\u305f\u56f3\u9762\u3068\u6a19\u6e96\u4ed5\u69d8\u306b\u3001\u6b63\u78ba\u306a\u30e2\u30c7\u30eb\u3068\u4ed8\u5c5e\u54c1\u3092\u4e00\u81f4\u3055\u305b\u307e\u3059\u3002.<\/li>\n<li>\u30ec\u30d3\u30e5\u30fc\u306e\u8abf\u6574\u3001\u8a31\u53ef\u306e\u53d6\u5f97\u3001\u6e29\u5ea6\u304a\u3088\u3073\u4fdd\u7ba1\u74b0\u5883\u306e\u78ba\u8a8d\u3092\u884c\u3046\u3002.<\/li>\n<li>\u7bc4\u56f2\u5185\u3067\u5ba3\u8a00\u66f8\u3001\u8a66\u9a13\u8cc7\u6599\u3001\u304a\u3088\u3073\u8a2d\u7f6e\u624b\u9806\u66f8\u306e\u63d0\u51fa\u3092\u6c42\u3081\u307e\u3059\u3002.<\/li>\n<li>\u5c0e\u5165\u6642\u306e\u8a18\u9332\u8a2d\u5b9a\u3001\u30c8\u30eb\u30af\u5024\u3001\u6a5f\u80fd\u30c6\u30b9\u30c8\u7d50\u679c\u3092\u8a18\u9332\u3057\u307e\u3059\u3002.<\/li>\n<\/ol>\n<h2>\u3088\u304f\u3042\u308b\u8cea\u554f<\/h2>\n<h3>Does an RCCB include overload protection?<\/h3>\n<p>No. An RCCB under IEC 61008-1 has no integral overcurrent protection and needs an appropriately coordinated MCB or fuse. Its ampere rating alone does not protect it from overload.<\/p>\n<h3>Why use separate RCBOs on final circuits?<\/h3>\n<p>A fault can be confined to the affected circuit when the protective arrangement is coordinated. This can improve fault identification and continuity, although upstream selectivity and neutral routing still require verification.<\/p>\n<h3>Can an RCCB and an RCBO use the same sensitivity?<\/h3>\n<p>They may have the same nominal residual-current threshold, but that does not establish selectivity when connected in series. Review time delay, waveform type and the manufacturer&#8217;s coordination guidance.<\/p>\n<h3>Which arrangement costs less?<\/h3>\n<p>Compare actual quotations for the complete panel, including separate overcurrent devices, space, wiring, testing and spares. There is no defensible universal price ranking based on the device abbreviation alone.<\/p>\n<h2>\u53c2\u8003\u6587\u732e<\/h2>\n<ul>\n<li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/67981\" rel=\"nofollow noopener\" target=\"_blank\">IEC 61009-1:2024 \u2014 RCBO \u306e\u4e00\u822c\u8981\u4ef6<\/a>.<\/li>\n<li><a href=\"https:\/\/electrical.theiet.org\/wiring-matters\/years\/2019\/77-september-2019\/which-rcd-type\/\" rel=\"nofollow noopener\" target=\"_blank\">IET \u2014 \u3069\u306e\u30bf\u30a4\u30d7\u306eRCD\u3067\u3059\u304b\uff1f<\/a>.<\/li>\n<li><a href=\"https:\/\/webstore.iec.ch\/en\/publication\/24656\" rel=\"nofollow noopener\" target=\"_blank\">IEC 60364-6:2016 \u2014 \u8a2d\u7f6e\u78ba\u8a8d<\/a>.<\/li>\n<\/ul>\n<p>Use the comparison as a design checklist, then ask W9 Group to confirm the exact RCBO or RCCB model, documentation and destination-market requirements.<\/p>\n<p>\u30ec\u30d3\u30e5\u30fc\u3092 <a href=\"https:\/\/w9-group.com\/ja\/%e5%9b%9e%e8%b7%af%e4%bf%9d%e8%ad%b7%e8%a3%bd%e5%93%81\/\">circuit protection range<\/a> against the approved circuit schedule. To discuss the exact order code and required documents, contact W9 Group technical team.<\/p>\n<p>\u56de\u8def\u30ec\u30d9\u30eb\u3067\u306e\u9078\u629e\u306b\u3064\u3044\u3066\u306f\u3001, <a href=\"https:\/\/w9-group.com\/ja\/contact-us\/\">W9\u30b0\u30eb\u30fc\u30d7\u3078\u306e\u304a\u554f\u3044\u5408\u308f\u305b<\/a> \u56de\u8def\u56f3\u3001\u8ca0\u8377\u6ce2\u5f62\u3001\u63a5\u5730\u914d\u7f6e\u3001\u304a\u3088\u3073\u9069\u7528\u53ef\u80fd\u306a\u8a2d\u7f6e\u898f\u5247\u3092\u8003\u616e\u3057\u3066\u3002.<\/p>","protected":false},"excerpt":{"rendered":"<p>\u81ea\u5b85\u306e\u96fb\u6c17\u914d\u7dda\u306b\u57cb\u3081\u8fbc\u307e\u308c\u305f\u5c0f\u3055\u306a\u30b5\u30a4\u30ec\u30f3\u30c8\u30b9\u30fc\u30d1\u30fc\u30d2\u30fc\u30ed\u30fc\u3092\u60f3\u50cf\u3057\u3066\u307f\u3066\u304f\u3060\u3055\u3044\u3002\u305d\u306e\u4f7f\u547d\u306f\u3001\u96fb\u6c17\u904e\u8ca0\u8377\u3084\u77ed\u7d61\u306b\u3088\u308b\u58ca\u6ec5\u7684\u306a\u706b\u707d\u3084\u3001\u5730\u7d61\u306b\u3088\u308b\u5371\u967a\u306a\u96fb\u6c17\u30b7\u30e7\u30c3\u30af\u3068\u3044\u3046\u3001\u6700\u3082\u6050\u308d\u3057\u3044\u5bb6\u5ead\u306e\u60aa\u5f79\u306e2\u3064\u3092\u9632\u3050\u3053\u3068\u3067\u3059\u3002JC3LE-2P RCBO\uff08\u6b8b\u7559\u96fb\u6d41\u906e\u65ad\u5668\uff09 (RCBO) (\u54c1\u756a\uff1aJC3LE-2P) \u3092\u3054\u6848\u5185\u3044\u305f\u3057\u307e\u3059\u3002<\/p>","protected":false},"author":1,"featured_media":4900,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-1395","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blog"],"blocksy_meta":{"styles_descriptor":{"styles":{"desktop":"","tablet":"","mobile":""},"google_fonts":[],"version":8}},"acf":[],"_links":{"self":[{"href":"https:\/\/w9-group.com\/ja\/wp-json\/wp\/v2\/posts\/1395","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/w9-group.com\/ja\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/w9-group.com\/ja\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/w9-group.com\/ja\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/w9-group.com\/ja\/wp-json\/wp\/v2\/comments?post=1395"}],"version-history":[{"count":6,"href":"https:\/\/w9-group.com\/ja\/wp-json\/wp\/v2\/posts\/1395\/revisions"}],"predecessor-version":[{"id":4646,"href":"https:\/\/w9-group.com\/ja\/wp-json\/wp\/v2\/posts\/1395\/revisions\/4646"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/w9-group.com\/ja\/wp-json\/wp\/v2\/media\/4900"}],"wp:attachment":[{"href":"https:\/\/w9-group.com\/ja\/wp-json\/wp\/v2\/media?parent=1395"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/w9-group.com\/ja\/wp-json\/wp\/v2\/categories?post=1395"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/w9-group.com\/ja\/wp-json\/wp\/v2\/tags?post=1395"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}